Pre construction is the only time to design for proper zoning, oversized returns, dedicated dehumidification, and ERV ventilation. Retrofits cost 3 5x more.
Demand Manual J load calc, Manual D duct design, and Manual S equipment selection from your HVAC contractor written, before signing off on plans.